& Polyvinyl chloride clay (plastic clay) Specifications: kg
Density: kg
Shelf life: months
Common names: plastic clay, clay, plastic ointment, waterproof ointment, caulking clay , polyvinyl chloride caulking material PVC cement is a kind of elasticity, strong adhesion, high heat resistance, good low temperature flexibility, slow aging, acid and alkali corrosion resistance, suitable for hot construction and can be used cold. A new type of building waterproof material. It is improved and developed on the basis of traditional clay. Can replace asphalt linoleum or other waterproofing materials. As building roofs, underground moisture-proofing, waterproofing of gutters and channels, road caulking, etc., it has good results. It is simple to construct and easy to repair, and is very popular among users.
Performance and advantages
It has good heat resistance and cold resistance. It does not drip in hot weather and does not stick to your feet. It is flexible in cold winter and can be used in a temperature range of +℃℃. It has a service life of more than ten years without aging.
, has good bonding and elongation properties, and is adaptable to changes in the roof base layer caused by thermal expansion and contraction, vibration, settlement and other reasons.
, aging resistance, certain acid, alkali and oil resistance.
Scope of construction
, Covering joints and waterproofing: supplying various new and old concrete roof panels, wall panels, floors, aqueducts, water pipes, overpasses, dams, tanks, driveways, underground tunnels, basements and other components. Sealing and waterproofing of structures can play a role in repairing seams and preventing leaks.
. Anti-seepage coating: Applying to dry roofs can replace linoleum to waterproof dry floors, mold surfaces, foundations, caverns, ground tanks and pipes. It can prevent seepage, moisture and corrosion.
Specially used for filling cracks and leaks in highways and bridges.
Construction method
& 1. Preparation before construction
Construction tools: seam cleaning machinery (seam cutting machine, hair dryer), seam filling machine (manual, mechanical), scraper, etc.
/>, construction materials: polyvinyl chloride clay, cleaning agent.
2. Construction
&. Seam clearing: Use a seam clearing machine to clear the cutting seams or expansion joints that need to be filled. The depth of the seams should be 2, and use a hair dryer to blow away the floating dust. There should be no floating dust on the surface
&, heating, filling: (Before heating and melting, the inner film bag must be torn off to prevent flakes from being formed during melting, which will affect the construction)
Mechanical filling: use a knife Cut the clay into blocks and put them into the caulking machine. The hot melt temperature is set at ℃ and the constant temperature is at ℃ (the melted clay cannot be in direct contact with the electric heating rod, but should be insulated with a layer of thermal oil). Replace the discharge hole. To d, the feed valve can be closed a little smaller, and the mesh size of the filter screen should be larger than the mesh size. Be careful not to bring sand and gravel into the machine when taking materials and cutting.
Manual filling: Use a pot with a heat-conducting oil layer for hot melting. The heating temperature (heated with a gentle fire) is preferably ℃. In order to prevent the temperature from being too high, coking and deterioration, it must be stirred up and down frequently. Each pot has a fusible bag ( kg), simmer and keep at constant temperature for use. When half of the melted material has been used, unmelted clay can be added. There is no need to wait until it is used up before adding it. When taking material from the liquid surface, you can put a screen on the liquid surface and then use it. Use a spoon to scoop out the glue from the screen for filling. When discharging the material from the bottom of the pot, the material must also be stirred up and down to prevent the upper soluble material from aging due to long-term use. When filling joints when the temperature is low, first use the joint filling spoon. Heat it on the fire, then use another spoon to scoop out the material and put it into the caulking spoon for filling. Do not use the caulking spoon to scoop the material directly from the pot, otherwise it will seriously pollute the road surface. You need a dedicated person to melt the rubber and Responsible for loading or unloading materials for the filling personnel on the trailer, and someone can fill the tank below at the same time (two stoves rotate to melt, and can fill kilometers per hour per hour).
The cement should be poured into the gaps without moisture, and the amount of pouring should be lower than the construction surface. (Note: When filling joints in hot weather, the concrete slabs will expand due to thermal expansion and contraction, so low pouring should be done in the morning. , flat irrigation at noon, high irrigation in the afternoon)
&. Cleaning: When filling joints, glue is often poured onto a flat surface accidentally. At this time, a scraper should be used to scrape off the glue on the road surface
&. Road Filling and maintenance of joints: On the pavement where the joints have been filled, the opening time depends on the temperature. When it is below ℃, it can be opened to traffic after it has been filled. The soles of the shoes must be glued before they can be opened to traffic
&. Leakage repair: When filling joints, there is often leakage or leakage of poured materials. For leakage, irrigation should be filled in time
&. Cleaning tools: After the construction is completed, The mixer and caulking machine should be cleaned with solvent, and the remaining glue should be scraped off the hot melt pot to prevent the remaining glue from coking during the next melt.
3. Precautions
Because when the concrete is wet, it will affect the adhesion of the product. Avoid construction on rainy days or in gaps with water. Therefore, you should know the weather forecast before construction. Do not do it when there is rain. Construction
Because the product contains flammable tar, care should be taken not to overflow when preheating and melting to prevent fire
When clearing the gap, the walls on both sides of the gap must be clean and dry, otherwise the glue and the gap will be affected. Bonding fastness, easy to debond
According to the requirements of the "Technical Specifications for Construction of Highway Cement Concrete Pavement", the glue filling depth should be, the shallowest is not less than.
Jiangsu Nantong polyvinyl chloride clay PVC waterproof ointment wholesale in stock